Monday 13 March 2017

Roy Hamilton Carriage Storage Shed plumbing & drainage - 10th&11th March 2017

With time running out before the new Catering starts on the Railway, a large squad was called on to get things done quickly, the digging was mostly done on the Friday.
 
 
Above Rigger Neil leaning on smallest spade ever, looks on enviously at the swift removal of earth and who says size doesn't matter! Martin is glad of the break. 
 
 
Above Colin and Plumber Jim.
 
Mike Tough reports- "The water to the shed had to be turned off whilst we plumbed in the new toilets in the Shed ...this caused drama & delay to the power washing of the 08 ahead of it’s imminent paint job .. all ended ok & the new toilet’s were working by lunchtime & Jim as is the plumbers right, demanded first use, Jim subsequently reported there were no leaks "which is above average""
 Mike managed to lose Colin's best file over the two days and had to take the associated ribbing.
 
Thanks go to Neil Howie, Martin McLeod, John Wood, Colin Frost, Jim Clark, Ray Kenyon who sent many photos and Mike for the report and Georgie for the JCB digging. 
 