The good sized P'Way squad met at Boat of Garten, loaded the appropriate tools into Georgie's van and proceeded to Lynchurn No 2 Level Crossing. Where for sometime now water has been running off the main A95 trunk road, down the short dirt track onto the Level Crossing, depositing a considerable amount of silt contaminating the ballast, which all had to be dug out by backbreaking shovel. This is the second time that I recall having to this at this location, plan is to use the JCB to dig ditches to hopefully prevent a reoccurrence.
 
 
Andy, Andrew, Ben, Roger and Mike (left to right) pose for Iain Ross at Lynchurn No 2. (I suspect fresh ballast will be dropped after ditches dug) The squad then went onto Croftnahaven No 2 level crossing to repeat the process and coachscrews inserted to keep the flangeway clear, alas no photos as what seemed like the remnants of hurricane Irma! forced the squad into the palatial barn to shelter.
 
Ian and John tried to mend the Jacker Packer at Boat of Garten North Yard and then assisted some of the Ellon Squad tidying scrap there.
 
On Sunday Andy, Bruce, Fergus and Georgie put in flangeway screws in Lynchurn No 2 and finished off tidying up, possibly also the cess at Aviemore Station loop.
 
Yesterday Bruce was painting with Reg Stanley (who is up for two weeks "Holiday", so best not standstill for too long when Reg is about!)
 
Thanks to all those that attended and for info/photo.
 
 